The City Council will consider amending the Master Fee Schedule to continue waiving certain permit fees for Accessory Dwelling Units (ADUs) through December 31, 2031.
recommendation header
STAFF RECOMMENDATION:
end
recommendation text
Adopt the Resolution Amending the Master Fee Schedule to Waive Certain City Permit Fees for Accessory Dwelling Units (ADUs) Less Than 750 Square Feet and ADUs 750 Square Feet or Larger That Are Deed Restricted as Lower-Income Units.
body
FINANCIAL IMPACT:
The impact on the General Fund over the next five years will depend on the number of building permits issued for accessory dwelling units that qualify for the waiver. Since January 1, 2022, the City has waived the fees for 38 permits totaling $321,062.30.
DESCRIPTION:
Background
In recent years, the City has implemented several measures to encourage development of Accessory Dwelling Units (ADUs), including streamlined permitting procedures, prototype ADU plans, an ADU Manual, and financial incentives.
On December 7, 2021, the City Council amended the City’s Master Fee Schedule through Resolution No. 133-21 to waive certain building permit and plan-check fees for eligible ADUs for a period of five years, which expires on December 31, 2026. This incentive is also included as Program B.7 in the City’s 2023-2031 Housing Element, adopted in November 2022.
The current fee waivers for building permit plan check and inspection fees apply to the following:
1. ADUs less than 750 square feet; and
2. ADUs 750 square feet or larger that are deed restricted as lower-income units for a period of 55 years.
ADUs required to satisfy Chapter 8.68 (Inclusionary Zoning Regulations) of the Dublin Municipal Code, the scope of work beyond the establishment of the ADU, and/or enforcement fees are not eligible for this fee waiver.
Over the past five years, the City has waived permit fees for 38 ADU permits for a total of $321,062.30. Of these, 37 were for ADUs less than 750 square feet, and one was for a deed-restricted ADU 750 square feet or larger. An overview of the permit fee waiver activity is provided in Table 1 below. For comparison, Table 2 provides a total of all ADU permits issued.
Table 1. ADU Permit Fee Waiver Activity
|
|
2022* |
2023 |
2024 |
2025 |
2026** |
Total |
|
ADUs less than 750 sf |
5 |
8 |
8 |
10 |
6 |
37 |
|
ADUs 750 sf or larger |
0 |
0 |
1 |
0 |
0 |
1 |
|
Fees waived |
$49,881.50 |
$63,731.50 |
$72,285.92 |
$91,580.72 |
$43,582.66 |
$321,062.30 |
* 2022 data include four permits for which applications were submitted before the waiver program began. Five additional units are reported as currently under construction.
**2026 data are through October 31, 2026.
Table 2. ADU Permit Activity
|
|
2022 |
2023 |
2024 |
2025 |
2026* |
Total |
|
Total ADU permits issued |
9 |
9 |
12 |
84 |
22 |
136 |
*2026 data are through October 31, 2026.
Analysis
The permit fee waiver complements other City initiatives intended to facilitate ADU development, including prototype plans, informational materials, streamlined permitting procedures, and the ADU Accelerator Program that recently concluded. While it is unknown whether property owners would have proceeded with these ADU projects without the financial incentive, eliminating these fees would decrease initial development expenses, which may be a factor for some property owners.
In addition, ADUs generally require less staff time for plan review and inspections compared to other projects involving new residential construction. For example, smaller ADUs (less than 750 square feet) typically do not require a geotechnical soils report, depending on site conditions, which reduces the need for additional technical review. The use of pre-approved prototype ADU plans also requires less project-specific plan review because much of the building design has already been reviewed. Similarly, factory-built ADUs have building plans reviewed by the California Department of Housing and Community Development (HCD), allowing City staff to focus primarily on the foundation, connections to the foundation, and utility connections rather than reviewing the entire building design. These types of projects generally require less staff time for plan review and inspections than other new residential construction projects, allowing the Building Division to process these applications using fewer staff resources while still maintaining required building safety and code compliance.
Waiving permit fees has some impact on the City’s General Fund as shown in Table 1 above. The waived fees represent revenue that would otherwise be collected. From 2022 to 2026, the City received an average of $5 million in permit fee revenue annually for all permits. The permit fees waived for ADUs represent approximately 1.3 percent of the total revenue.
Maintaining the permit fee waiver for an additional five years through 2031 would continue the implementation of Housing Element Program B.7 related to ADU incentives. Over the next five years, the City will update its Housing Element for the 7th Cycle (2031-2039 planning period) and will further evaluate the effectiveness of the program and other incentives to advance the production of housing and ADUs.
Staff recommends that the City Council adopt the Resolution, included as Attachment 1, amending the Master Fee Schedule and continuing to waive permit fees for another five years through December 31, 2031.
STRATEGIC PLAN INITIATIVE:
Priority 4: Housing Affordability
Objective A: Advance implementation of the Housing Element to increase the production of affordable housing.
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
The City Council Agenda was posted.
ATTACHMENTS:
1) Resolution Amending the Master Fee Schedule to Waive Certain City Permit Fees for Accessory Dwelling Units (ADUs) Less Than 750 Square Feet and ADUs 750 Square Feet or Larger That Are Deed Restricted as Lower-Income Units